On April 17th, voters will be asked to authorize the proposition to issue bonds for $75 million dollars. If approved, the referendum would provide the following improvements throughout the District:
| Batavia High School |
- 16 Standard classrooms
- 9 Specialized classrooms
- Building trades lab
- CADD lab
- CADD/Graphics Journalism lab
- early childhood teaching area
- drama room
- band room
- orchestra room
- choir room
- science room
- Auditorium
- 5 PE/Fitness stations
- 31 Total teaching stations to be constructed
- + 3 specialized lab spaces
- language lab
- 2 science labs
- Surveillence system
- Exterior access system
|
| Rotolo Middle School |
- Auxiliary gymnasium, circulation space and a physical education lobby area
- Surveillence system
- Exterior access system
|
| Alice Gustafson School |
- Early Childhood Center
- One additional classroom
- Classroom casework replacement
- Surveillence system
- Exterior access system
|
| H.C. Storm School |
- HVAC replacement
- Masonry repairs
- Surveillence system
- Exterior access system
|
| Louise White School |
- HVAC replacement
- Masonry repairs
- Surveillence system
- Exterior access system
|
| J.B. Nelson School |
- Classroom casework replacement
- Surveillence system
- Exterior access system
|
| Grace McWayne School |
- Surveillence system
- Exterior access system
|
| Hoover-Wood School |
- Surveillence system
- Exterior access system
|